Corby Power Station

Office and recreation space for 150 workers

Requirement

When the annual outage at Corby Power Station was combined with major construction work on the plant's exhaust ducts, which required a large number of construction staff to be located on site for an extended period. Following a recommendation, the power station contacted site accommodation specialists Portakabin (Site Accommodation) to see what they could offer.

Solution

Robin Heward, Mechanical Maintenance Coordinator at Corby Power Station, says: "We were really impressed by the quality of products in the Konstructa portfolio, which looked much better than anything we had used in the past. So we decided to give them a try for this year's extended outage."

The station ordered 12 large, 30-foot Konstructa office buildings, plus nine combined canteen and drying room units, as well as separate site toilet and shower facilities. The offices were double stacked due to space constraints on the site, and Portakabin (Site Accommodation) provided and fitted all the necessary staircases.

We were really impressed by the high standard of the Konstructa buildings and we had some good feedback from the contractors who were using them every day. The service we received from Portakabin (Site Accommodation) was excellent and the buildings performed well throughout this abnormally long outage. Next year we will be back to a normal ten-day maintenance shutdown and Konstructa will be top of our list to provide our temporary site accommodation.

Robin Heward

Mechanical Maintenance Coordinator, Corby Power Station