Downing
Property developer Downing used Portakabin to provide site accommodation for a particularly small site that required a creative solution
- Construction
- Site Accommodation
- 10 - 50
Graham Group needed a three-tier site accommodation complex for a high-profile construction site in Glasgow. Under the shadow of the Barclays Bank building, and just a stone’s throw from the River Clyde, the buildings were required to provide welfare facilities and offices for numerous site staff and sub-contractors.
In collaboration with the project team we were able to design an accommodation layout to make maximum use of the limited footprint on this busy site the structure had to climb to three tiers high.
In only three weeks from the initial order, eighteen, 32ft Konstructa buildings were delivered and installed in time to meet the challenging deadline. The three-tier complex was achieved, creating optimum accommodation space for the allocated footprint.
It was during a period of heavy demand for site accommodation, but Portakabin was still able to supply all the modules that Graham Group required. This was achieved within a busy city-centre location that meant deliveries had to work around site and public traffic.
Property developer Downing used Portakabin to provide site accommodation for a particularly small site that required a creative solution
When ISG Construction refurbisehd Wigan Town Hall, they turned to Portakabin to provide fire-rated cabins for site offices and welfare units
Longcross Group utilised a raised modular site accommodation solution from Portakabin for Darlington Sainsbury's upgrade