A first-floor extension to Sainsbury's Brentwood store, accommodating a cafe & car park lobby, toilets, staff facilities and a bulk storage area
- Retail
- Retail Unit
- 24
Tesco needed to provide a temporary store in Barnsley for seven weeks to reduce disruption to customers during the redevelopment of its existing superstore. The interim building was then to be moved to a permanent location in Aberdeen.
The Barnsley store was delivered using the Portakabin Design and Build solution. This was the first application of a new 10,000sqft modular supermarket design, developed by Portakabin for Tesco. The project was completed in just 11 weeks from receipt of order to trading – a time saving of around four weeks compared to previous temporary stores.
The new off-site supermarket design is almost three times the size of the convenience stores previously manufactured by Portakabin for Tesco. It has been engineered to increase the level of off-site fitting out and to maximise clear spans in the sales area by reducing the number of internal columns.
The building was constructed from 26 steel-framed modules measuring 14 metres long, which were manufactured and substantially fitted out off-site in York. Ceramic floor tiles, roller shutters, freezers and chillers, shelving, internal walls, plumbing, electrics, mechanical ventilation, sanitary-ware, doors and shop front glazing were all pre-installed in the factory.
The building was installed on site in just three days, and was open to customers less than three weeks later.
A first-floor extension to Sainsbury's Brentwood store, accommodating a cafe & car park lobby, toilets, staff facilities and a bulk storage area
Portakabin helped to construct a new petrol filling station for Tesco in Leigh with their new kiosk design as part of a major new store development
Portakabin constructed their 200th modular restaurant with McDonalds on Elland Road opposite Leeds United Football Club, creating 60 new jobs