Newman Catholic School
Portakabin delivered a fully equipped interim school, restoring education for 650 pupils following devastating floods.
- Education
- Classroom
- 100+
In early 2018, the University of Bristol appointed Portakabin to provide an additional teaching facility in time for the new academic year in September. Despite the limited space for construction works on the university site, Portakabin created more than 700m2 of teaching space on the campus by using modular construction methods.
The University of Bristol site was a challenge, but thanks to modular delivery and installation methods, we were able to provide the university with a large building by installing 22 modules over five days. Access to the site was particularly challenging, as each module has a height of 3.5m and the access point was a maximum of 3.9m. Our expert team worked within this 40cm clearance by using two forklift trucks to manoeuvre the modules through the tight access point and into the open space where a crane lifted the modules into place. It was amazing to watch the team get each module through the gap and into place so smoothly.
Portakabin delivered a fully equipped interim school, restoring education for 650 pupils following devastating floods.
After almost four years of searching for a solution to a challenging site, Priory Fields Primary School had its new modular school building delivered in just six weeks.
Radon membrane barrier, early year playground with equipment and Astroturf, air conditioning and access control, installation of new soakaway, timber-effect vinyl wrap with school logo, internal graphics, oak-effect vinyl flooring, new secure line fencing, fire tender road, pedestrian route to entrance and new gates, grass area and pathways