Capital Dock
27 modules in a triple-stack formation, riverside installation and 450 m² of construction office space.
- Construction
- Site Accommodation
Suir Engineering required high-quality site accommodation for its staff and contractors, including office and meeting areas, canteens and changing rooms, but had limited space and the added challenge of a sloping site. They also requested a rapid turnaround from the Portakabin team.
The Portakabin team designed a doublestacked building, using Konstructa modules, which could be delivered and installed in stages, ensuring that some accommodation could be made available as soon as possible.
The building complex, with timed heating and lighting systems, was completed and ready for Suir’s team within a month.
27 modules in a triple-stack formation, riverside installation and 450 m² of construction office space.
Large-scale modular complex and site cabins to cater for office and construction staff
Furniture, project management, layout drawings and foundations, wall-timed heaters and PIR sensors.